You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Heavy athlethics stadium, Greece

Dados de projecto

Localização: Athens, Grécia

Heavy athletics stadium for the 2004 Olympic Summer Games with a suspended roof structure

Requisitos

  • support of the enormous, 72 m long steel lattice girders
  • high loads
  • strong wind loads
  • complex contact area

Cliente

J&P – AVAX SA

Benefícios para o cliente

  • fast erection and dismantling
  • moving of whole units by crane
George Foutris, Project leader, Statement, Heavy Athletics Stadion Atehs
George Foutris
Project leader

The PERI MULTIPROP and HD 200 systems could be combined in an ideal way in order to safely transfer the high vertical loads despite the complicated geometry of the steel lattice girders. Based on the experience during this project, I can say that for me, PERI is a formwork supplier with the technical expertise and large delivery potential that can help us to master such difficult tasks.

Soluções PERI

  • combination of HD 200 and MULTIPROP to create a 21 m high support system for a load transfer of 500 kN